PERI UP Flex Reinforcement Scaffolding in action
-
Save time through simplicity
A modular system, easy to handle and install, with high factors of safety, make PERI UP reinforcement an easy partner on your project
-
Easy to move, even in larger units
The Bracing Scaffold can be moved by crane in larger units to improve site efficiency
-
Safety as standard
All PERI UP solutions feature built-in safety features such as the gravity lock and integrated toeboards. With high factors of safety, ample working space and a stable working platform, workers can focus on the job in hand with peace of mind
-
Stable
Ballast and anchors are not required.
Product Data Sheet
Scaffold type
Reinforcement Framework
Type of use
Working scaffold up to load class 3 (200kg/m²)
Width class
SW 03, SW 06, SW 09, SW 12, SW 15
Load class
LK 1, LK 2, LK 3, LK 4, LK 5, LK 6
Design width
75cm, 100cm
Body heights
Up to 10.80 meters
Scaffolding grid
Metric
Type of pavement
Steel
Structure principle
Advance assembly in the system according to TRBS 2121-1 possible
Body length
1 field, 2 fields, 3 fields
Field length
150 cm, 200 cm, 250 cm, 300 cm
Base width
150 cm, 200 cm
Compatible with
PERI UP scaffolding kit