The Project
Project Information
Mr. Saurabh Jangle
Director - S J Contracts
DUO shuttering was used for the retaining walls, and shear walls at this project. We are able to cast 4 m height walls in one go using this system. This light weight system is very easy to erect at a height of 4 m and labor and time required is much lesser than any other panel formwork systems. PERI has gone out of the way and provided very good technical support throughout the duration of the project. We were able to achieve form finished concrete for the lift core with the PERI Birch ply used as the formlining.