EON, Pune

Project data

Location: Pune, India

S.J. Contracts is a leading construction company with over two decades of comprehensive experience in the industry. EON Project is a 22-storeyed rtesidential tower in the EON IT Hub of Pune.

 

 

Requirements

  • Formwork system for the retaining walls
  • Formwork system for the shear wall
  • Rail climbing system for lift core

Customer

S J Contracts, Pune

Customer's benefit

  • Customer was able to cast 4 m height walls in one go using DUO formwork system. DUO is light weight formwork system that is very easy to erect at a height of 4 m and labor and time required is much lesser than any other panel formwork systems. Customer were able to achieve form finished concrete for the lift core with use of the PERI Birch plywood as form lining.
Mr. Saurabh Jangle
Director - S J Contracts

DUO shuttering was used for the retaining walls, and shear walls at this project. We are able to cast 4 m height walls in one go using this system. This light weight system is very easy to erect at a height of 4 m and labor and time required is much lesser than any other panel formwork systems. PERI has gone out of the way and provided very good technical support throughout the duration of the project. We were able to achieve form finished concrete for the lift core with the PERI Birch ply used as the formlining.

PERI solution

  • PERI provided complete solution with RCS, VARIO and DUO Formwork System for the lift core and walls. As a special requirement, lift core walls were needed to be maintained two levels above the slab which is effectively achieved by RCS (Rail Climbing System). Peri also provided technical support for the project.