Meghnaghat Power plant, Bangladesh

Project data

Location: Dhaka, Bangladesh

A non-greenfield Project of constructing the destroyed portion of power-plant with live running pipeline network. the main task included construction of turbine generator deck which had average beam depth of 3.6m.

Requirements

  • Construction of Beams with beam depth upto 4.2m.
  • Supporting the beams which were at the height upto 6 m from the ground.
  • the functioning of powerplant must not be hindered with the construction and the existance of live running pipelines on the site.

Customer

Dosaan Skoda Power limited

Customer's benefit

  • Uninterupted plant functioning.
  • PERI UP shoring providing enough space below deck for smooth commute.
  • Larger depths of columns and beams casted in one shot.
  • Full site support during whole project for better technical supervision.

PERI solution

  • PERI provided shoring with PERI UP to support the elevated turbine-generator deck.
  • the heavy soffit of deep beams was supported with MULTIFLEX formwork system and beam side formwork with VARIO wall formwork.
  • Engineered shoring solution through live web of pipelines.